Land Surveyors in Port Elizabeth
We have worked from Taiwan to Chad.
- Topographic Surveys
- Setting Out Surveys
- As Built Surveys
- Volume Calcs and Design
- Road Surveys
- Drone Surveys
- Power Line Surveys
- Earthworks Surveys
- Pipe Line Surveys




Topographical Surveys – to measure the earths surface to produce detailed maps with contours in Cad format. The cad map is used by engineers and planners for most civil projects.
Road Surveys – Set out roads, As built of roads, Volumes ,X sections and Long sections

Setting out – Staking structures according to engineers drawings.
Tunneling – All aspects of setting out tunnels drill and blast and TBM
Oil fields – Setting out of new oilfields. Designing lease pads for oil rigs and all internal roads in oil field.

Drone Surveys – to cover large areas to survey or areas that are difficult to survey conventionally.
Hydrographic Survey – Measuring the river beds, harbours and ocean floor with echo sounders.
Arnold and Johan decided to join forces as land surveyors in 2016.
Both of us have more than 30 years experience in engineering survey.
Projects we have been involved included dams, roads, harbours, oil fields ,tunnels ,power-lines and township work.
We have been privilege to work on large international projects to small construction companies .Taking our work from South Africa to Chad, Guinea, Taiwan ,Lesotho, Namibia and Mozambique.
Our obligation is to ensure that all survey work is done precise and professional manner on time. To do this we use the latest survey equipment available to us.
Equipment: RTK GPS, Robotic Total Station, DJI Drone,Electronic Level, Model Maker Software and Auto cad.
No job is too small, too big or too remote for us.


The Neckartal Dam is located near Keetmanshoop in the Fish River.
It is a RCC dam and 67.5m high at the centre of the dam wall.
It will have a storage volume of about 846 million cubic metres water for irrigation purposes.
About 10km upstream a weir and a pump station has been constructed including 8.4km pipeline and balancing dam.
Companies: Knight Piesold and Salini

Mokolo Crocodile Pipeline project is 46km pipeline up to 1.1m in diameter and will deliver approximately 30 million cubic metres of water per annum.
It also included 4.5MW pump station which is taking water from the Mokolo Dam in Lephalale and supplying to existing infrastructures mainly to Matimba and Medupi Power Stations.
Companies: LTA Grinnaker and Joint venture Goba Hatch, Aurecon, Vela VKE and PD Naidoo
Project cost: R2.1 billion

Multibillion US dollar ongoing project.
Oil explorations from the main land of Chad.
New oil platforms had to be constructed for oil rig operations.
Platforms, access roads and pipeline routes were designed and surveyed by us.
Company: PetroChad Mangara Ltd (Glencore)

The Port of Ngqura, Coega Harbour is a deepwater port 20km of Port Elizabeth with a depth of between 16m and 18m.
A strategic development to attract foreign and local investment in manufacturing industries.
The project was to extend the quay wall of 780m by 520m providing a total length of 1300m and a depth of 16m.
This also included paving roads, road bridges and services.
Company: Hochtief
Project cost: R1.65 billion.

The Mohale Tunnel is located in the Maloti mountains of Lesotho.
The tunnel is 32km long with a 4.25m in diameter was constructed to deliver water from the Mohale dam to the Katse dam, which is than able to deliver water to Vaal Triangle in South Africa.
Companies: Concor and Hochtief

High speed rail that runs approximately 350km along the west coast of Taiwan, from the capital of Taipei to the southern city of Kaohsiung.
The involvement were in the 7km Section of bridges that were constructed, using precast, I-beams and sliding shutters.
Company: Hochtief
Project Cost: US$ 16 billion

The Berg River Dam located in Franschhoek South Africa.
The dam is a 62m high concrete faced rock fill dam with a storage volume of 130 million cubic meters of water.
It also included two pump stations with a power of 25MW, 12km pipeline and balancing dam.
The dam was constructed to alleviate the water shortage in the Cape Town area.
Companies: WBHO, LTA
Project cost: R1.5 billion

The100km 400kV Matimba-Midas Transmission line was constructed due to the need for power on the Platinum Belt in the Rustenburg area.
Company: ABB and Eskom
Project cost: R43 million
Summerstrand, Port Elizabeth,
South Africa.
Email: johan@survtec.co.za
Tel: 079 5026 148 (Johan)
Tel: 082 494 3200 (Arnold)
Tel: 079 5026 148 (Johan)